Landfill leachate and concentrate
DTRO was originally developed for landfill leachate treatment. Through years of applications, improvement and continuous optimization, Sotec has developed standardized single-stage and double-stage integrated equipment based on leachate treatment scales: 50m3/d, 100m3/d, 200m3/d, 300m3/d.
Sotec Environmental offers complete leachate and concentrate treatment solutions.Solutions
Pretreatment + MBR + single-stage DTRO process
Two-stage DTRO process
TLD leachate concentrate full treatment process
Typical process: MBR+DTRO process
Scope of application:
More suitable for projects with treatment scale above 200m3/d
Applicable to the treatment of all incineration plant leachate as there is an anaerobic system at the front end
Typical process: Two-stage DTRO process
Scope of application:
Small and medium-sized projects of 200m3/d and below
Suitable for full-cycle water quality of landfills, especially aging landfills
Especially suitable for treatment of leachate with significant changes in water quality or poor biochemical properties
Particularly suitable for extremely cold areas (where biochemical processes cannot proceed normally)
Typical process: TLD leachate concentrate full treatment process
Scope of application:
Leachate of old landfill
High-salinity landfill leachate
Concentrate produced during DTRO treatment
Typical application cases
Project |
Process |
Scale |
Time |
Project of emergency treatment of leachate from central refuse transfer station of Jinjiang District | Two-stage DTRO | 100m3/d | 2017.07 |
Project of emergency treatment of refuse leachate in Kangbashi, Ordos | Two-stage DTRO | 100m3/d | 2018.06 |
Project of emergency treatment of refuse leachate from urban-rural refuse treatment center of Zigong | Two-stage DTRO | 600m3/d | 2018.10 |
Project of Ordos Environmental Protection Investment Co., Ltd. purchasing the service of harmless treatment of domestic waste leachate | Two-stage DTRO | 100m3/d | 2018.12 |
Project of hazardous waste leachate treatment in Zibo, Shandong | Two-stage DTRO | 150m3/d | 2018.07 |
Capital Environment purchasing complete leachate treatment equipment for household waste incineration power generation project in Suixian County | (USAB)+MBR+DTRO+RO | 200m3/d | 2018.10 |
Capital Environment purchasing complete leachate treatment equipment for household waste incineration power generation project in Suixian County | (USAB)+MBR+DTRO+RO | 200m3/d | 2018.10 |
Capital Environment purchasing complete leachate treatment equipment for household waste incineration power generation project in Xihua | (UASB)+MBR+DTRO+RO | 150m3/d | 2018.10 |
Purchase of leachate treatment equipment for household waste incineration power generation project in Ruijin | Two-stage DTRO | 200m3/d | 2019.01 |
Leachate treatment operation service project of refuse disposal plant in Ning’er County, Yunnan | Two-stage DTRO + ion exchange | 500m3/d | 2019.01 |
Refuse leachate treatment operation service project in Bozhou District, Zunyi, Guizhou | Two-stage DTRO + ion exchange | 200m3/d | 2019.01 |
Leachate treatment operation service project of landfill in Anyue, Sichuan | TLD concentrate treatment | 300m3/d | 2019.09 |
Phase II domestic waste incineration power generation project of Sichuan Everbright in Zigong | High-pressure DTRO(90 bar) | 210m3/d | 2019.10 |
Guiyang Biliba leachate emergency operation service project | Pretreatment + two-stage DTRO | 750m3/d | 2019.12 |
Project of emergency treatment of leachate from refuse dump of Jianwei County, Sichuan | Pretreatment + two-stage DTRO | 400m3/d | 2020.02 |