Landfill leachate and concentrate

      DTRO was originally developed for landfill leachate treatment. Through years of applications, improvement and continuous optimization, Sotec has developed standardized single-stage and double-stage integrated equipment based on leachate treatment scales: 50m3/d, 100m3/d, 200m3/d, 300m3/d.

      Sotec Environmental offers complete leachate and concentrate treatment solutions.

Solutions

Pretreatment + MBR + single-stage DTRO process

Two-stage DTRO process

TLD leachate concentrate full treatment process

Typical process: MBR+DTRO process

Scope of application:

More suitable for projects with treatment scale above 200m3/d

Applicable to the treatment of all incineration plant leachate as there is an anaerobic system at the front end

Typical process: Two-stage DTRO process

Scope of application:

Small and medium-sized projects of 200m3/d and below

Suitable for full-cycle water quality of landfills, especially aging landfills

Especially suitable for treatment of leachate with significant changes in water quality or poor biochemical properties

Particularly suitable for extremely cold areas (where biochemical processes cannot proceed normally)

Typical process: TLD leachate concentrate full treatment process

Scope of application:

Leachate of old landfill

High-salinity landfill leachate

Concentrate produced during DTRO treatment

Typical application cases

Project

Process

Scale

Time

Project of emergency treatment of leachate from central refuse transfer station of Jinjiang District Two-stage DTRO 100m3/d 2017.07
Project of emergency treatment of refuse leachate in Kangbashi, Ordos Two-stage DTRO 100m3/d 2018.06
Project of emergency treatment of refuse leachate from urban-rural refuse treatment center of Zigong Two-stage DTRO 600m3/d 2018.10
Project of Ordos Environmental Protection Investment Co., Ltd. purchasing the service of harmless treatment of domestic waste leachate Two-stage DTRO 100m3/d 2018.12
Project of hazardous waste leachate treatment in Zibo, Shandong Two-stage DTRO 150m3/d 2018.07
Capital Environment purchasing complete leachate treatment equipment for household waste incineration power generation project in Suixian County (USAB)+MBR+DTRO+RO 200m3/d 2018.10
Capital Environment purchasing complete leachate treatment equipment for household waste incineration power generation project in Suixian County (USAB)+MBR+DTRO+RO 200m3/d 2018.10
Capital Environment purchasing complete leachate treatment equipment for household waste incineration power generation project in Xihua (UASB)+MBR+DTRO+RO 150m3/d 2018.10
Purchase of leachate treatment equipment for household waste incineration power generation project in Ruijin Two-stage DTRO 200m3/d 2019.01
Leachate treatment operation service project of refuse disposal plant in Ning’er County, Yunnan Two-stage DTRO + ion exchange 500m3/d 2019.01
Refuse leachate treatment operation service project in Bozhou District, Zunyi, Guizhou Two-stage DTRO + ion exchange 200m3/d 2019.01
Leachate treatment operation service project of landfill in Anyue, Sichuan TLD concentrate treatment 300m3/d 2019.09
Phase II domestic waste incineration power generation project of Sichuan Everbright in Zigong High-pressure DTRO(90 bar) 210m3/d 2019.10
Guiyang Biliba leachate emergency operation service project Pretreatment + two-stage DTRO 750m3/d 2019.12
Project of emergency treatment of leachate from refuse dump of Jianwei County, Sichuan Pretreatment + two-stage DTRO 400m3/d 2020.02